Need to move Applications from O11 to ODC.
hi KUNDRAPU HEMANTH,
Visit these links
https://www.outsystems.com/blog/posts/o11-to-odc/
https://esystemsnordic.medium.com/from-outsystems-11-to-outsystems-cloud-f2e86497e743
Hope this helps
Thanks
Prince
Hello KUNDRAPU HEMANTH,
The transition from OS11 to OutSystems Development Cloud (ODC) is currently a gradual process. Unfortunately, there are no quick or straightforward steps for this migration at this point in time. The need to manually copy/paste elements from Service Studio to ODC Studio for porting functionality is a key aspect, as mentioned by Fernando and documented in various other discussions (Support and like this idea: Link to the idea).
The article I wrote for my company last July provides some practical approaches and suggestions we are taking into account internally to prepare for these changes, offering insights for those navigating in this transition. However, it's clear that the process involves careful consideration of various approaches, weighing the pros and cons to determine the most suitable path for each scenario and transition. (You can check the article here: Link to the article).
In addition to the technical aspects, it is important to recall that ODC is exclusively offered as a paid option. The fact that users cannot experiment or undergo training (besides the two weeks offered) with ODC until their license is activated is an important consideration for organizations planning or currently undergoing this transition. Besides this, you can also check some other pains/challenges in my other article, "The Major Limitations Associated with ODC" (Link to the article).
Anyway, ODC is not a complete feature set yet. So, some of these issues/pains might become solved in the near future. We just need to exercise our patience a little bit more.
Hope this will help, Ana